• Rinsho Shinkeigaku · Nov 2002

    [Application of the information technology for critical path and neurointensive care unit].

    • Muetaka Haida and Yukito Shinohara.
    • Department of Physiology, Tokai University School of Medicine.
    • Rinsho Shinkeigaku. 2002 Nov 1;42(11):1186-7.

    AbstractAn effectiveness of neurointensive care unit for the treatment of neurological diseases and an application of the information technology (IT) for this and a critical pathway were discussed. A critical pathway is useful to make a standardized treatment, to reduce the days in hospital and to obtain an informed consent. But the hospital information system should include the critical pathway in itself otherwise doctors have to make duplicated order to nurses and the hospital ordering system.

      Pubmed     Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?

    User can't be blank.

    Content can't be blank.

    Content is too short (minimum is 15 characters).

    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…