• Crit Pathw Cardiol · Mar 2015

    Effects of critical pathway on the management of patients with ST-elevation acute myocardial infarction in an emergency department.

    • Dong Ryeol Ryu, Jang Won Choi, Bong-Ki Lee, and Byung Ryul Cho.
    • From the *Division of Cardiology, Department of Internal Medicine, School of Medicine, Kangwon National University; and †Department of Internal Medicine, Kangwon National University Hospital, Chuncheon, Korea.
    • Crit Pathw Cardiol. 2015 Mar 1; 14 (1): 31-5.

    Background AimsCritical pathways (CP) are clinical management plans that provide the sequence and timing of actions of medical staff. The main goal of a CP is to provide optimal patient care and to improve time-effectiveness. Current guidelines for the treatment of ST-segment elevation myocardial infarction (STEMI) recommend a door-to-balloon time of <90 minutes for patients undergoing primary percutaneous coronary intervention (PCI). The aim of this study was to identify the effects of CP on the management of patients with STEMI in an emergency department.MethodsThe study population consisted of 175 patients undergoing primary PCI for STEMI who presented to the emergency department of Kangwon National University Hospital (Chuncheon, South Korea) with chest pain from July 1, 2005 to November 30, 2010. We retrospectively analyzed medication use, symptom onset-to-door times, door-to-balloon times, total ischemic times, and the reperfusion rate within 90 minutes. We also measured the 30-day and 1-year total mortality rates pre- and post-CP implementation.ResultsThe effects of CP implementation on the medication use outcomes in patients with acute myocardial infarction were increased between the pre- and post-CP patients groups. The median door-to-balloon time declined significantly from 85 to 64 minutes after CP implementation (P = 0.001), and the primary PCI rate within 90 minutes was significantly increased (57% vs. 79%, P = 0.01). However, the symptom to door time was not changed between the pre- and post-CP groups (150 minutes vs. 149 minutes; P = 0.841). Although the total ischemic time was decreased after CP implementation, it was not statistically insignificant (352.5 minutes vs. 281 minutes; P = 0.397). Moreover, the 30-day and 1-year total mortality rates of the 2 groups did not change (12.0% vs. 12.0%, P > 0.999; 13.0% vs. 17.3%, P = 0.425, respectively). However, the 1-year mortality rates of 2 groups based on a total ischemic time of 240 minutes, which was median value, decreased significantly from 19.0% to 9.0%. (P = 0. 018) CONCLUSION:: Implementation of a CP resulted in greater use of recommended medications and reductions in the median door-to-balloon time. However, it did not reduce the symptom onset-to-door time, total ischemic time, or the 30-day and 1-year mortality rates. Therefore, additional strategies are needed to reduce mortality in patients with acute myocardial infarction undergoing primary PCI.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…