• JACC. Heart failure · Oct 2013

    Implant strategies change over time and impact outcomes: insights from the INTERMACS (Interagency Registry for Mechanically Assisted Circulatory Support).

    • Jeffrey J Teuteberg, Garrick C Stewart, Mariell Jessup, Robert L Kormos, Benjamin Sun, O H Frazier, David C Naftel, and Lynne W Stevenson.
    • Heart and Vascular Institute, University of Pittsburgh Medical Center, Pittsburgh, Pennsylvania. Electronic address: teutebergjj@upmc.edu.
    • JACC Heart Fail. 2013 Oct 1; 1 (5): 369-78.

    ObjectivesThis study investigated how the initial intended strategy at left ventricular assist device (LVAD) implantation influenced patient outcomes.BackgroundLeft ventricular assist device implantation strategy impacts candidate selection, reimbursement, and clinical trial design; however, concepts of device strategy are continuing to evolve.MethodsFor patients entered in the INTERMACS (Interagency Registry for Mechanically Assisted Circulatory Support) receiving a primary continuous flow LVAD between March 2006 and March 2011, initial strategies were bridge to transplant (BTT), bridge to candidacy (BTC) for transplant, and destination therapy (DT). Primary analyses compared BTT, BTC, and DT outcomes at 6, 12, and 24 months.ResultsAmong 2,816 primary LVAD recipients, implant strategy was 1,060 (38%) BTT, 1,162 (42%) BTC (likely to be listed 796, moderately likely 282, unlikely 84), and 553 (20%) DT. Compared with BTC/DT, those listed at implant (BTT) had similar degrees of ventricular dysfunction and hemodynamic derangement but generally less comorbidity. Survival (alive with LVAD or transplanted) was superior at 24 months for BTT versus BTC versus DT (77.7% vs.70.1% vs. 60.7%, respectively, p < 0.0001). Strategic intent changed over time, at 2 years 43.5% of BTT patients were no longer listed for transplant, but 29.3% of BTC patients were listed for transplant.ConclusionsThe currently accepted indications only account for 58% of LVAD implants. Across indications, patients differ by the number and types of comorbidities rather than the need for hemodynamic support. Regardless of initial implant strategy, patients often have long durations of support, and strategies often change over time, challenging the regulatory categorization of LVAD recipients as either BTT or DT.Copyright © 2013 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.

      Pubmed     Free full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…