-
- M L Sladek, K K Swenson, L J Ritz, and L M Schroeder.
- Institute for Research and Education, HealthSystem Minnesota, Minneapolis, USA.
- Clin J Oncol Nurs. 1999 Jul 1; 3 (3): 99-106.
AbstractAs the trend of surgical procedures shifting from inpatient to outpatient settings continues, outpatient-focused standardized care processes will become more of a necessity. A multidisciplinary critical pathway (CP) for breast cancer surgery can assist care providers in meeting patients' educational and psychosocial needs. The CP document discussed in this article takes into account the expedient nature of outpatient surgery and spans the continuum of care from the surgical clinic to the postoperative homecare visit. Integrating homecare nursing improves the quality and consistency of care.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:

- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.