-
- Jung-Hyun Kim, Bonhyuk Goo, and Sang-Soo Nam.
- Department of Acupuncture & Moxibustion, Kyung Hee University Hospital at Gangdong, Gangdong-gu, Seoul, Republic of Korea.
- Medicine (Baltimore). 2022 Oct 7; 101 (40): e30161e30161.
AbstractPatients affected with facial palsy consult both traditional Korean medicine doctors and conventional medicine doctors. Considering that the optimal approach varies depending on the progress of the disease, there is a need for facial palsy management through integrated medical care. However, no critical pathway has been developed to manage facial palsy from an integrated medical perspective. The aims of this study were to (a) explore treatment utilization status and awareness for facial palsy; (b) understand possible traditional Korean medicine modalities; and (c) suggest interventions to be included in integrated medical service for treating facial palsy. Regarding existing papers in relevant field, draft of questionnaire was firstly established. Eight-person development committee was comprised and reviewed the draft and modified the items of questionnaire. As an independent committee, the authors of present study have rechecked the validity and reliability of modified items of questionnaire. A questionnaire was developed comprising 21 items, including demographic characteristics, clinical statement, recognition, and demands and directions to improve the quality of newly developing critical pathways. Using the services of the Association of Korean Medicine and Medistream, the questionnaire was sent via a web-based survey to traditional Korean medicine doctors. A total of 1017 valid questionnaires were collected from traditional Korean medicine doctors. Of the total doctors who responded, over 75% stated that they utilized integrated medical systems in various forms. Acupuncture, herbal medicine, and thermal therapy were presented as key traditional Korean medicine treatments to be included in the critical pathway for the establishment of integrated medical services. Conversely, corticosteroids, antivirals, and blood sugar management were chosen to be critical among conventional medical treatments. Considering the responses collected in the present study and the progressive nature of facial palsy, various interventions in both conventional and traditional Korean medicine services need to be included in relevant critical pathways. If the critical pathway developed based on the present study is established, relevant clinical practice guidelines could be made available in an integrated medical system.Copyright © 2022 the Author(s). Published by Wolters Kluwer Health, Inc.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:

- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.