• Clinical cardiology · Dec 2004

    Comparative Study

    Critical pathways in the emergency department improve treatment modalities for patients with ST-elevation myocardial infarction in a European hospital.

    • Francesco Pelliccia, Domenico Cartoni, Monica Verde, Paolo Salvini, Giuseppe Mercuro, and Pietro Tanzi.
    • Department of Cardioscience, San Camillo Hospital, Rome, Italy. f.pelliccia@mclink.it
    • Clin Cardiol. 2004 Dec 1;27(12):698-700.

    BackgroundThe use of protocols for patients with ST-elevation myocardial infarction (MI) is growing, but no definite conclusion regarding the value of critical pathways in Europe has been drawn.HypothesisThe aim of this study was to investigate the impact of critical pathway on processes of care and outcome for patients presenting to the emergency department (ED) of a large urban European hospital because of possible ST-elevation MI.MethodsCritical pathways for management of acute chest pain at our ED were developed in 1998 and have been revised every year. Accordingly, the records of all patients referred in 1997 to the ED because of chest pain (before pathway implementation) and in 2001 (after last pathway revision) were reviewed. An ST-elevation MI was diagnosed at ED in 520 of 5,066 (10.3%) patients with chest pain in 1997, and in 452 of 4,843 (9.3%) patients with chest pain in 2001. Patients were managed according to the ED cardiologists' decisions in 1997, whereas they entered the pathways for ST-elevation MI in 2001, with predefined criteria for diagnosis, thrombolysis, percutaneous coronary intervention, and admission to the coronary care unit.ResultsComparison of treatment modalities disclosed that more patients were given thrombolysis in 1997 (49 vs. 16%, p<0.05), whereas in 2001 more patients were sent to primary angioplasty (63 vs. 11%, p<0.05). Also in 2001, patients more often received aspirin (90 vs. 61%, p<0.05) and intravenous beta blockers (60 vs. 35%, p<0.05) soon after arrival at the ED. Comparison between 1997 and 2001 revealed that admission rates to the coronary care unit (69 vs. 78%, NS) and cardiac wards were similar (19 vs. 10%, NS). Conversely, compared with 1997, patients hospitalized in 2001 had a shorter length of stay (12 +/- 5 vs. 18 +/- 6 days, p<0.05), as well as fewer major adverse coronary events (21 vs. 30%, p<0.05) and lower all-cause in-hospital mortality (12 vs. 20%, p<0.05). The quality of care indicators improved with time, as door-to-electrocardiogram interval (10 +/- 6 vs. 19 +/- 9 min, p<0.05), door-to-needle time (25 +/- 10 vs. 35 +/- 10 min, p<0.05), and door-to-balloon interval (70 +/- 15 vs. 99 +/- 20 min, p<0.05) were shorter in 2001 than in 1997.ConclusionsA critical pathway for ST-elevation MI at the ED increases the use of evidence-based treatment strategies and improves outcome and quality of care of patients presenting to a European hospital because of acute chest pain.

      Pubmed     Free full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…