-
- Klaus Sahora, Vicente Morales-Oyarvide, Sarah P Thayer, Christina R Ferrone, Andrew L Warshaw, Keith D Lillemoe, and Carlos Fernández-Del Castillo.
- Department of Surgery, Massachusetts General Hospital, Harvard Medical School, Boston, MA, USA.
- Am. J. Surg. 2015 Jun 1;209(6):1028-35.
BackgroundDelayed gastric emptying (DGE) after pancreaticoduodenectomy increases length of hospital stay and costs, and may be influenced by surgical techniques.MethodsWe retrospectively compared 400 patients with antecolic gastrojejunostomy with 400 patients with retrocolic gastrojejunostomy for the occurrence of DGE.ResultsThe prevalence of DGE was 15% in the antecolic group and 21% in the retrocolic group (P = .021), and median length of stay was shorter for the former (8 vs. 10 days, P = .001). The difference was statistically significant with grade A DGE (9% vs. 14%, P = .038), but not B or C. In a multivariate analysis, DGE was influenced by retrocolic reconstruction, as well as older age, chronic pancreatitis, preoperative bilirubin level, a history of previous upper abdominal surgery, and postoperative pancreatic fistula.ConclusionsAn antecolic gastrojejunostomy for classic non-pylorus-preserving pancreaticoduodenectomy is associated with a lower incidence of mild DGE (grade A) and a shorter length of stay.Copyright © 2015 Elsevier Inc. All rights reserved.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:

- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.