-
Health services research · Apr 2005
Critical pathway effectiveness: assessing the impact of patient, hospital care, and pathway characteristics using qualitative comparative analysis.
- Sydney M Dy, Pushkal Garg, Dorothy Nyberg, Patricia B Dawson, Peter J Pronovost, Laura Morlock, Haya Rubin, and Albert W Wu.
- Maryland Community Hospice, Room 609, 624N. Broadway, Baltimore, MD 21205, USA.
- Health Serv Res. 2005 Apr 1;40(2):499-516.
ObjectiveTo qualitatively describe patient, hospital care, and critical pathway characteristics that may be associated with pathway effectiveness in reducing length of stay.Data Sources/Study SettingAdministrative data and review of pathway documentation and a sample of medical records for each of 26 surgical critical pathways in a tertiary care center's department of surgery, 1988-1998.Study DesignRetrospective qualitative study. DATA COLLECTION/ABSTRACTION METHODS: Using information from a literature review and consultation with experts, we developed a list of characteristics that might impact critical pathway effectiveness. We used hypothesis-driven qualitative comparative analysis to describe key primary and secondary characteristics that might differentiate effective from ineffective critical pathways.Principal Findings" All 7 of the 26 pathways associated with a reduced length of stay had at least one of the following characteristics: (1) no preexisting trend toward lower length of stay for the procedure (71 percent), and/or (2) it was the first pathway implemented in its surgical service (71 percent). In addition, pathways effective in reducing length of stay tended to be for procedures with lower patient severity of illness, as indicated by fewer intensive care days and lower mortality. Effective pathways tended to be used more frequently than ineffective pathways (77 versus 59 percent of medical records with pathway documents present), but high rates of documented pathway use were not necessary for pathway effectiveness.ConclusionsCritical pathway programs may have limited effectiveness, and may be effective only in certain situations. Because pathway utilization was not a strong predictor of pathway effectiveness, the mechanism by which critical pathways may reduce length of stay is unclear.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:

- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.