• J Healthc Qual · Sep 1997

    Evaluation of a critical pathway for pneumonia.

    • G Ross, D Johnson, M Kobernick, and R Pokriefka.
    • Macomb Hospital Center, Warren, MI, USA.
    • J Healthc Qual. 1997 Sep 1;19(5):22-9, 36.

    AbstractPneumonia is the third most frequent admission diagnosis at Macomb Hospital Center. The average length of stay for this diagnosis (DRGs 89 and 90) was 9.07 days. After the initiation of a critical pathway that begins in the emergency department, the average length of stay decreased to 7.11 days. Quality of care also improved in two areas: the time elapsed before delivery of antibiotics and availability of X-ray reports. This article reviews the implementation and results of the critical pathway for pneumonia.

      Pubmed     Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…

Want more great medical articles?

Keep up to date with a free trial of metajournal, personalized for your practice.
1,706,662 articles already indexed!

We guarantee your privacy. Your email address will not be shared.