• TheScientificWorldJournal · Jan 2014

    Delay analysis of networked control systems based on 100 M switched Ethernet.

    • Ming Li.
    • College of Mathematics & Computer Science, Wuhan Textile University, Wuhan 430200, China.
    • ScientificWorldJournal. 2014 Jan 1; 2014: 751491.

    AbstractFor the delay may degrade the performance of networked control systems, networked control systems based on 100 M switched Ethernet are proposed in this paper. According to the working principle of Ethernet switch, the formulas of the upper bound delay of the single-level switched Ethernet and the multiple-level switched Ethernet are deduced by the timing diagram method, and the values of the upper bound delay are also given. The key factors that influence the upper bound delay of switched Ethernet are analyzed; then, the characteristics of the upper bound delay are presented, which show that the delay induced by the single-level 100 M switched Ethernet has little effect on the performance of control systems, while the delay induced by the multiple-level 100 M switched Ethernet may meet the time requirements of all classes of control systems if the numbers of levels and the numbers of nodes connecting to switches are set properly. Finally, the performance of networked control systems is simulated by TrueTime, and the results further show the feasibility and superiority of 100 M switched Ethernet based networked control systems without modification of the network protocols.

      Pubmed     Free full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…

Want more great medical articles?

Keep up to date with a free trial of metajournal, personalized for your practice.
1,706,642 articles already indexed!

We guarantee your privacy. Your email address will not be shared.