-
Gynecologic oncology · Aug 2014
Minimally invasive surgery for endometrial cancer: does operative start time impact surgical and oncologic outcomes?
- Katrina N Slaughter, Michael Frumovitz, Kathleen M Schmeler, Alpa M Nick, Nicole D Fleming, Ricardo dos Reis, Mark F Munsell, Shannon N Westin, Pamela T Soliman, and Pedro T Ramirez.
- Department of Gynecologic Oncology, The University of Oklahoma Health Sciences Center, Oklahoma City, OK, USA.
- Gynecol. Oncol. 2014 Aug 1; 134 (2): 248-52.
ObjectiveRecent literature in ovarian cancer suggests differences in surgical outcomes depending on operative start time. We sought to examine the effects of operative start time on surgical outcomes for patients undergoing minimally invasive surgery for endometrial cancer.MethodsA retrospective review was conducted of patients undergoing minimally invasive surgery for endometrial cancer at a single institution between 2000 and 2011. Surgical and oncologic outcomes were compared between patients with an operative start time before noon and those with a surgical start time after noon.ResultsA total of 380 patients were included in the study (245 with start times before noon and 135 with start times after noon). There was no difference in age (p=0.57), number of prior surgeries (p=0.28), medical comorbidities (p=0.19), or surgical complexity of the case (p=0.43). Patients with surgery starting before noon had lower median BMI than those beginning after noon, 31.2 vs. 35.3 respectively (p=0.01). No significant differences were observed for intraoperative complications (4.4% of patients after noon vs. 3.7% of patients before noon, p=0.79), estimated blood loss (median 100 cc vs. 100 cc, p=0.75), blood transfusion rates (7.4% vs. 8.2%, p=0.85), and conversion to laparotomy (12.6% vs. 7.4%, p=0.10). There was no difference in operative times between the two groups (198 min vs. 216.5 min, p=0.10). There was no association between operative start time and postoperative non-infectious complications (11.9% vs. 11.0%, p=0.87), or postoperative infections (17.8% vs. 12.3%, p=0.78). Length of hospital stay was longer for surgeries starting after noon (median 2 days vs. 1 day, p=0.005). No differences were observed in rates of cancer recurrence (12.6% vs. 8.8%, p=0.39), recurrence-free survival (p=0.97), or overall survival (p=0.94).ConclusionOur results indicate equivalent surgical outcomes and no increased risk of postoperative complications regardless of operative start time in minimally invasive endometrial cancer staging, despite longer length of hospital stay for surgeries beginning after noon.Copyright © 2014 Elsevier Inc. All rights reserved.
Notes
Knowledge, pearl, summary or comment to share?You can also include formatting, links, images and footnotes in your notes
- Simple formatting can be added to notes, such as
*italics*
,_underline_
or**bold**
. - Superscript can be denoted by
<sup>text</sup>
and subscript<sub>text</sub>
. - Numbered or bulleted lists can be created using either numbered lines
1. 2. 3.
, hyphens-
or asterisks*
. - Links can be included with:
[my link to pubmed](http://pubmed.com)
- Images can be included with:

- For footnotes use
[^1](This is a footnote.)
inline. - Or use an inline reference
[^1]
to refer to a longer footnote elseweher in the document[^1]: This is a long footnote.
.