• Annals of surgery · Dec 2019

    Randomized Controlled Trial

    A Statistical Model-driven Surgical Case Scheduling System Improves Multiple Measures of Operative Suite Efficiency: Findings From a Single-center, Randomized Controlled Trial.

    • Panos Kougias, Vikram Tiwari, Sherene E Sharath, Andrea Garcia, Amita Pathak, Millie Chen, David Ramsey, Neal R Barshes, and David H Berger.
    • Operative Care Line, Michael E. DeBakey VA Medical Center, Houston TX.
    • Ann. Surg. 2019 Dec 1; 270 (6): 1000-1004.

    ObjectiveWe sought to determine whether a data-driven scheduling approach improves Operative Suite (OS) efficiency.BackgroundAlthough efficient use of the OS is a critical determinant of access to health care services, OS scheduling methodologies are simplistic and do not account for all the available characteristics of individual surgical cases.MethodsWe randomly scheduled cases in a single OS by predicting their length using either the historical mean (HM) duration of the most recent 4 years; or a regression modeling (RM) system that accounted for operative and patient characteristics. The primary endpoint was the imprecision in prediction of the end of the operative day. Secondary endpoints included measures of OS efficiency; personnel burnout captured by the Maslach Burnout Inventory; and a composite endpoint of 30-day mortality, myocardial infarction, wound infection, bleeding, amputation, or reoperation.ResultsTwo hundred and seven operative days were allocated to scheduling with either the RM or the HM methodology. Mean imprecision in predicting the end of the operative day was higher with the HM approach (30.8 vs 7.2 minutes, P = 0.024). RM was associated with higher throughput (379 vs 356 cases scheduled over the course of the study, P = 0.04). The composite rate of adverse 30-day events was similar (2.2% vs 3.2%, P = 0.44). The mean depersonalization score was higher (3.2 vs 2.0, P = 0.044), and mean personal accomplishment score was lower during HM weeks (37.5 vs 40.5, P = 0.028).ConclusionsCompared to the HM scheduling approach, the proposed data-driven RM scheduling methodology improves multiple measures of OS efficiency and OS personnel satisfaction without adversely affecting clinical outcomes.

      Pubmed     Full text   Copy Citation     Plaintext  

      Add institutional full text...

    Notes

     
    Knowledge, pearl, summary or comment to share?
    300 characters remaining
    help        
    You can also include formatting, links, images and footnotes in your notes
    • Simple formatting can be added to notes, such as *italics*, _underline_ or **bold**.
    • Superscript can be denoted by <sup>text</sup> and subscript <sub>text</sub>.
    • Numbered or bulleted lists can be created using either numbered lines 1. 2. 3., hyphens - or asterisks *.
    • Links can be included with: [my link to pubmed](http://pubmed.com)
    • Images can be included with: ![alt text](https://bestmedicaljournal.com/study_graph.jpg "Image Title Text")
    • For footnotes use [^1](This is a footnote.) inline.
    • Or use an inline reference [^1] to refer to a longer footnote elseweher in the document [^1]: This is a long footnote..

    hide…